Nineteen years ,eleven landmarks.

Marinas and resorts, metro, hydropower, water infrastructure and major commercial developments across five countries.

11Projects
5Countries

ABOUT PROJECT REFERENCES AND PROFESSIONAL EXPERIENCE

The projects in this section illustrate the professional experience gained by Sarif Group co-founder Arif Dağ in his previous professional roles, and the work he contributed to. These projects were delivered by the employers, contractors and project stakeholders he worked with during the respective periods.

These projects are not presented as works carried out by Sarif Group or as direct contractual references of our company. Project names and images are used solely to illustrate professional experience, without prejudice to the rights of their respective owners.

Unless expressly stated otherwise, no current commercial relationship, partnership, sponsorship or endorsement with project owners, employers or contractors should be assumed.

Luštica BayLustica Bay7 photos

Luštica Bay

2023 – 2026
Location Tivat, MontenegroDeveloper / Contractor Luštica Bay developmentScope Marina, residences, villas & hospitality

Marina, residential buildings, villas and accommodation facility development projects.

Portonovi Waterfront Resort & ResidencesHerceg Novi-Portonovi 3 photos

Portonovi Waterfront Resort & Residences

2018 – 2023
Location Kumbor, MontenegroDeveloper / Contractor Azmont Investments / Impresa PizzarottiScope Marina, residences, villas, spa & hotel

Large-Scale Luxury Tourism and Housing Projects

Doha Metro Gold Line — Joaan StationDoha - Goldline6 photos

Doha Metro Gold Line — Joaan Station

2015 – 2018
Location Doha, QatarDeveloper / Contractor ALYSJ JVScope Underground metro station

The Doha Metro's Golden Line was constructed by a consortium including Turkish companies Yapı Merkezi and STFA. Opened on November 21, 2019, the line is entirely underground, 14 kilometers long, and has 11 stations.

Erbil Water Supply ImprovementErbil-İfraz5 photos

Erbil Water Supply Improvement

2014 – 2015
Location Erbil, IraqDeveloper / Contractor STFA / FERNAS / KALYON JVScope 240,000 m³/day purification facility

Increasing the capacity of the water treatment plant from 144,000 m³/day to 240,000 m³/day, laying 624 km of pipeline, and renovating the drinking water distribution networks in Erbil and Duhok.

Lankaran Infrastructure ProjectLenkeran, Azerbaycan6 photos

Lankaran Infrastructure Project

2013 – 2014
Location Lankaran, AzerbaijanDeveloper / Contractor AZERSU / HIDRO-LOTUS MMCScope ≈ USD 300M water & sewerage

Lankaran Water Supply and Wastewater Infrastructure Project | Azerbaijan

A comprehensive infrastructure project encompassing 230 km of drinking water lines, 200 km of sewage network, a wastewater treatment plant with a capacity of 40,000 m³/day, 11 km of transmission lines, and a water reservoir with a capacity of 20,000 m³.

Yusufeli Dam & Hydroelectric Power Plant5 photos

Yusufeli Dam & Hydroelectric Power Plant

2012 – 2013
Location Artvin, TürkiyeDeveloper / Contractor LİMAK ConstructionScope 270 m dam, hydropower & tunnels

YUSUFELI DAM & HYDROELECTRIC POWER PLANT | ARTVIN, Türkiye

Mersin Carrefour Mall (Palm City)PalmCity5 photos

Mersin Carrefour Mall (Palm City)

2011 – 2012
Location Mersin, TürkiyeDeveloper / Contractor Bilkent Holding / Tepe ConstructionScope 30,000 m² shopping mall

The Palm City Mersin Renovation Project is a renovation effort that transformed the city's first shopping mall with a budget of $30 million. Completed in 24 months without interruption, the project increased the leasable area to 34,000 square meters and the number of stores to 67 [Palm City Mersin]. Renovated with a focus on daylight-based architecture, the project integrates a 10-screen cinema, restaurants with terraces, and a parking garage with a capacity of 1,500 vehicles.

Forum Kayseri Shopping MallForum Kayseri6 photos

Forum Kayseri Shopping Mall

2010 – 2011
Location Kayseri, TürkiyeDeveloper / Contractor Bilkent Holding / Tepe ConstructionScope 170,000 m² shopping mall

Forum Kayseri Shopping Mall Project, undertaken by Tepe İnşaat and Multi Turkmall as the main contractors, is the city's largest commercial and lifestyle center investment. Opened on December 21, 2011, the project boasts a total gross construction area of 176,500 square meters and a leasable area of 65,000 square meters. Housing over 200 stores and a parking garage with a capacity of 2,000 vehicles, the complex is Kayseri's first BREEAM green building certified project thanks to its sustainable architecture.

Yalova Biological Wastewater Treatment Plant4 photos

Yalova Biological Wastewater Treatment Plant

2008 – 2010
Location Yalova, TürkiyeDeveloper / Contractor Hidrotek A.Ş.Scope 100,000 m³/day treatment facility

The Yalova Advanced Biological Wastewater Treatment Plant is an infrastructure project with a capacity of 50,000 m³/day (ultimately 100,000 m³/day) using the Bardenpho process for nitrogen and phosphorus removal [Yalova Advanced Biological Wastewater Treatment Plant, YASKİ]. The plant has an automated operating system that meets one-third of its own electricity needs with a 1 MWp capacity Solar Power Plant (SPP) built on aeration ponds.

Forum Ankara Shopping Mall5 photos

Forum Ankara Shopping Mall

2006 – 2008
Location Ankara, TürkiyeDeveloper / Contractor Bilkent Holding / Tepe ConstructionScope 136,000 m² shopping mall

Forum Ankara Outlet Shopping Mall Project is a massive commercial investment built in Keçiören, Ankara, with Tepe İnşaat and Multi Turkmall as the main contractors. Opened on October 18, 2008, and designed with an open-air street concept, the project has a total gross construction area of 170,000 square meters. This huge structure, with approximately 86,500 square meters of leasable space, houses 139 independent stores, an 11,600 square meter hypermarket area, and a parking capacity for 3,000 vehicles.

Deriner Dam & Hydroelectric Power PlantDeriner Barajı2 photos

Deriner Dam & Hydroelectric Power Plant

2005 – 2006
Location Artvin, TürkiyeDeveloper / Contractor Yılmazlar A.Ş.Scope 670 MW underground powerhouse

Technostroyexport carried out the excavation of the river diversion tunnels and the 100-meter underground power plant tunnel, as well as the supply and installation of heavy hydromechanical equipment such as steel penstocks and inlet valves.

0
Personnel Supervised — Doha Metro
0MW
Underground Powerhouse — Deriner
0K m³/day
Water Purification — Erbil
0m
Dam Height — Yusufeli
Your Project

Let’s discuss your next project.

Contact Us